BisonByte

Technology investment & research

Research on the technologies reshaping how the world works.

BisonByte publishes independent research, built on primary data, across six interconnected areas: AI and compute, robotics and autonomy, energy and power, space, computational biology and public blockchains. We work from regulatory filings, official statistics and open datasets, and we publish our sources alongside the research.

Explore our research areas ↓

01 / 06

AI & Compute

The models, the chips that train and run them, and the data centers that house both. AI has become an infrastructure build-out as much as a software story. The largest cloud providers are spending at record levels on data centers, chips and power, while the training compute behind frontier models has grown roughly 4–5x a year, according to Epoch AI.

$201.9B
Combined Q3 2026 cash capex of Microsoft, Alphabet, Amazon and Meta
Source: Company 10-Q filings
~5.7x
Increase since Q1 2022 ($35.5B)
Source: SEC filings; BisonByte calc.

AI & Compute · Infrastructure spending

Capex at the four largest hyperscalers is up ~5.7x since early 2022

Quarterly cash capital expenditures (purchases of, or additions to, property and equipment), US$ billions, calendar quarters, Q1 2022 – Q3 2026.

BISONBYTE RESEARCHSource: SEC EDGAR, Form 10-Q / 10-K cash flow statements (XBRL) of Microsoft, Alphabet, Amazon and Meta Platforms; retrieved 2026-11-19. Notes: Microsoft’s fiscal quarters are mapped to calendar quarters (its fiscal year ends June 30). Cash capex only. All four companies also acquire capacity through finance leases, which are not captured here (Q3 2026: Microsoft obtained $5.19B of finance-lease right-of-use assets; Amazon acquired $1.47B of property and equipment under finance leases), and Meta discloses ~$355.73B of leases not yet commenced as of Sep 30, 2026 (10-Q). Amazon = gross purchases of P&E (before proceeds and incentives); Meta = purchases of P&E, net. Each value is the latest reported figure, which may come from a later filing (e.g., Q1 2022 from comparative columns in 2023 filings); Q4 and some Q2/Q3 values are derived as full-year or year-to-date totals minus the prior year-to-date total.

02 / 06

Robotics & Autonomy

Machines that sense, decide and act in the physical world: industrial robots, autonomous vehicles, drones and humanoids, along with the actuators, sensors and manufacturing behind them. Industrial robot installations reached a record 603,000 units in 2025 after four years of relatively flat development, and China accounted for 59% (IFR). On public roads, driverless ride-hailing is now operating at commercial scale in parts of California: monthly driverless trips reported to the state’s utilities regulator rose from about 49,000 in September 2023 to 1.53 million in September 2026, and since November 2023 a single operator has reported all of them. Humanoid robots are still early, and most shipment figures for them are estimates rather than reported data.

603,000
Industrial robots installed worldwide in 2025, up 11% year over year
Source: IFR World Robotics 2026
1.53M
Driverless ride-hail trips in California in September 2026, all from one operator
Source: CPUC deployment program reports

Robotics & Autonomy · Autonomous vehicles

Driverless ride-hail trips in California grew about 30-fold in three years

Monthly driverless passenger trips reported to the CPUC under its deployment program, Sep 2023 – Sep 2026. Since November 2023, a single operator has reported all of these trips.

BISONBYTE RESEARCHSource: California Public Utilities Commission (CPUC), Autonomous Vehicle Passenger Service, Deployment Program quarterly data reports (carrier month-level files), reporting periods Sep 2023 – Sep 2026; retrieved 2026-11-19. Notes: Trips in driverless vehicles (no safety driver) under the Deployment Program, in which carriers may charge fares; excludes service with a safety driver and pilot-program rides (e.g., Zoox’s free San Francisco service). Cruise reported trips for Sep–Oct 2023 only; since Nov 2023, Waymo has been the only carrier reporting driverless deployment trips. Trip totals are as filed; some other fields are redacted under pending confidentiality claims.

03 / 06

Energy & Power

Generation, transmission and grid interconnection, with storage as one part of the system. Electricity demand is rising as data centers, electrification and new manufacturing add load: US data centers used 4.7% of the country’s electricity in 2024 and could use 9.5–15.3% by 2030 in LBNL’s scenarios. Connecting new supply has become the bottleneck. At the end of 2025, about 2,061 GW of generation and storage was waiting in US interconnection queues, more than the country’s entire installed fleet on paper, though LBNL notes that most of it will never be built. Battery storage is one of the fastest-growing sources of new capacity, with 56 GW of utility-scale batteries in service as of September 2026 (EIA).

2,061 GW
Generation and storage capacity waiting in US interconnection queues at the end of 2025
Source: LBNL, Queued Up 2026
61 months
Median wait from interconnection request to operation for projects completed in 2025
Source: LBNL, Queued Up 2026

Energy & Power · Grid interconnection

Power projects completed in 2025 waited a median of 61 months to connect to the grid, up from 22 months in 2008

Months from interconnection request to commercial operation, by year the project came online, 2005–2025. Line = median; band = middle 50% of projects.

BISONBYTE RESEARCHSource: Lawrence Berkeley National Laboratory (LBNL), Queued Up: 2026 Edition (June 2026) and Data Center Energy Usage Report: 2025 Update (June 2026). Notes: Data center share in the text is from the data center report; everything else from Queued Up. Queue data file: LBNL_Ix_Queue_Data_File_thru2025.xlsx, updated May 2026, tab “IR to COD – all”; retrieved 2026-11-19. Sample of 3,310 generation and storage projects from 6 ISOs/RTOs and 19 non-ISO balancing areas that reached commercial operation from 2005 to 2025; coverage varies by year and region. Shaded band = 25th to 75th percentile. Excludes separate queues for large loads such as data centers. The 2025 sample includes no MISO or NYISO projects. Queue totals: 2,061 GW active at end-2025, including about 749 GW of storage (about 358 GW of it paired with generation at the same site), vs. about 1,374 GW of installed US capacity (EIA-860, December 2025, as compiled by LBNL), so the comparison is not like-for-like. LBNL: only about 13% of capacity requested in 2000–2020 had reached commercial operation by the end of 2025.

04 / 06

Space

Launch, connectivity and observation. Launch costs to low Earth orbit have fallen sharply, and launch cadence has reached record levels. Published comparisons put the advertised price of a partly reusable medium-lift rocket at roughly $2,600 per kilogram to low Earth orbit, versus roughly $65,400 for the Space Shuttle (CSIS, FY2021 dollars). These are list or reconstructed prices, not internal costs; they assume a full dedicated payload, and the decline cannot be attributed to reusability alone. Large satellite constellations are turning low Earth orbit into infrastructure for broadband, Earth observation and data services.

329
Orbital launch attempts worldwide in 2025, up from 87 in 2015
Source: GCAT (J. McDowell); BisonByte count
83%
Share of 2025 orbital launch attempts, failures included, on US and Chinese rockets
Source: GCAT, by launch-vehicle country; BisonByte calc.

Space · Launch activity

Orbital launches nearly quadrupled from 2015 to 2025, with nearly all of the growth in the US and China

Orbital launch attempts by the launch vehicle’s country, 2015 vs. 2025, including failures. In 2025, a single US provider flew about 94% of US launches (170 of 181) and about half of all orbital launches worldwide (GCAT).

BISONBYTE RESEARCHSource: Jonathan McDowell, General Catalog of Artificial Space Objects (GCAT), launchlog.tsv, planet4589.org (catalog updated 2026-11-19); retrieved 2026-11-19. BisonByte count of unique orbital (O) and deep-space (D) launch attempts, including failures, grouped by GCAT’s launch-vehicle state (LVState). Notes: Europe = France (Ariane, Vega and, in 2015, Soyuz launched by Arianespace from French Guiana), Italy/ESA and Germany. GCAT assigns Electron by launch site: in 2025, 17 launches from New Zealand count as New Zealand and 1 from Wallops, Virginia, counts as US. Other = Iran, Israel, South Korea and Australia. Labels show 2025 counts. Launch price per kilogram in the text: CSIS Aerospace Security Project, “Space Launch to Low Earth Orbit: How Much Does It Cost?” (FY2021 dollars; Falcon 9 $2,600/kg, Space Shuttle $65,400/kg), as transcribed by Our World in Data.

05 / 06

Computational Biology

Biology is turning into a data problem. In 2001, sequencing a human-sized genome cost about $95 million at the sequencing centers funded by the National Human Genome Research Institute; by May 2022, the same estimate was about $525. The steepest drop came after 2008, driven by the shift to next-generation sequencing technologies (NHGRI). Cheap, abundant sequence data, along with protein-structure prediction and machine learning, is what makes computational biology possible at scale. Increasingly, the hard part is not generating the data but making sense of it.

$95.3M
Estimated cost to sequence a human-sized genome, September 2001
Source: NHGRI
$525
The same estimate in May 2022, the latest NHGRI data point
Source: NHGRI

Computational Biology · Sequencing cost

Sequencing a human genome cost about $95 million in 2001. By 2022, it cost about $525.

Estimated production cost of sequencing a human-sized genome at NHGRI-funded centers, US dollars, log scale, Sep 2001 – May 2022.

BISONBYTE RESEARCHSource: National Human Genome Research Institute (NHGRI), “DNA Sequencing Costs: Data,” genome.gov, data file Sequencing_Cost_Data_Table_May2022.xls (data through May 2022; page last updated May 16, 2023); retrieved 2026-11-19. Notes: Production costs at NHGRI-funded sequencing centers: labor, administration, reagents, instruments amortized over three years, initial data processing, data submission and indirect costs. Excludes quality control, technology development, project management and downstream analysis. Estimate for a human-sized (3,000 Mb) genome, not the cost of a specific project. Per NHGRI, data through Oct 2007 reflect Sanger-based capillary sequencing; from Jan 2008, second-generation (next-generation) platforms. Dashed gray line: hypothetical cost halving every two years from the Sep 2001 value, the Moore’s law comparison NHGRI uses in its own charts (BisonByte calculation). May 2022 is the latest data point NHGRI has published.

06 / 06

Public Blockchains

Dollar stablecoins have grown into a market of roughly $285 billion; the largest are backed mainly by cash, short-term Treasuries and repo, and the US now has a federal framework for them. Whether public blockchains become settlement infrastructure for digital dollars, rather than mainly venues for trading, is the question our research tests. The $285B figure below is DefiLlama’s total USD-pegged supply, not a subset screened for reserve quality. The GENIUS Act, signed July 18, 2025 (Public Law 119-27), takes effect January 18, 2027.

$285B
US-dollar stablecoins in circulation as of Nov 19, 2026
Source: DefiLlama
~85%
Share held by the two largest: USDT and USDC
Source: DefiLlama; BisonByte calc.

Public Blockchains · Stablecoins

Dollar stablecoin supply reached $285.23B on Nov 19, 2026, up from $4.17B at end-2019 but below its ~$313B peak in May 2026

Total circulating supply of US-dollar-pegged stablecoins across public blockchains, US$ billions, month-end, Jan 2019 – Nov 19, 2026. Down 4.3% year over year (DefiLlama).

BISONBYTE RESEARCHSource: DefiLlama Stablecoins dataset (stablecoins.llama.fi/stablecoincharts/all, field totalCirculatingUSD → peggedUSD), aggregated from on-chain supply; retrieved 2026-11-19. Notes: Latest data point: Nov 19, 2026. Supply peaked at ~$313B on May 17, 2026, and is down 4.3% from Nov 19, 2025. Tether (USDT) and USD Coin (USDC) account for ~85% of the total (DefiLlama); issuers publish their own reserve attestations. DefiLlama is a third-party aggregator, and its methodology may differ from issuer-reported figures. The series is total USD-pegged supply, not a reserve-quality subset. Dashed line: the GENIUS Act (Public Law 119-27) was signed on July 18, 2025.

Our view

How the six areas connect

Energy & Power is the foundation: power sets how fast compute can scale. AI & Compute is the engine. Robotics & Autonomy and Computational Biology are where AI meets the physical and molecular worlds, and each feeds data and demand back into it. Space and Public Blockchains are two new networks, one for connectivity and observation, the other for settlement. These links are our interpretation, and we test them against data in our research.

Arrows show the direction of influence as we see it; two-headed arrows run both ways. The dashed link is a thesis we are still testing. Numbers correspond to the list.

How we work

Every number has a source.

Every chart on this site draws on a filing, an official statistic or an open dataset and shows its source and retrieval date.

Primary sources first

SEC filings, company investor-relations releases, government statistics and established industry datasets.

Facts kept separate from inference

We label what is reported, what we calculate and what we infer, and publish the underlying data with each chart.

Reproducible methods

We document how each figure is built and correct the record when data are revised.

Interested in working with us?

Investment Analyst, Technology · Data Engineer · Quantitative Analyst · Analyst Intern

Write to us at info@bisonbyte.ai.

View roles

Independent, primary-data research on the technologies reshaping the economy.

BisonByte publishes research for informational purposes only. Nothing on this site constitutes investment advice or an offer or solicitation to buy or sell any security, fund or other financial product; no fund or investment product is offered through this site. Content on this site has not been reviewed by any regulator. Data come from sources believed to be reliable but are not guaranteed, and views may change without notice. See our full Disclosures.

© 2026 BisonByte. All rights reserved.  ·  Contact: info@bisonbyte.ai